Free worldwide shipping over $150GRA & IGI certified stones30-day returns & one free resize
Forum›Rings›Rings: Seasonal Planning: The Four Order
HO

HOLYCOME EditorialOP

November 16, 2026 · 4 min read

Rings: Seasonal Planning: The Four Order

Rings: Seasonal Planning: The Four Order

On rings, the calendar is the biggest cost driver after material. Orders placed in the wrong window pay a rush premium, a higher freight rate and a lower sell-through, all at once.

6 replies in this thread

01

HOLYCOME Editorial

reply #1

Window one: Valentine's, order in October

Valentine's selling runs from late January to mid February. On rings, the carton needs to be in the warehouse by the second week of January, which puts the PO in early October.

Peak factory queues start after the US Thanksgiving, so an October PO still gets a normal slot. A November PO does not.

Ask for the plating thickness in microns, then test the contact points on the first lot. A thirty-second cloth rub shows color transfer before a customer does.

02

HOLYCOME Editorial

reply #2

Window two: Mother's Day and graduation

Mother's Day is the second Sunday of May; graduation runs May to June. The PO belongs in February, with the carton landing by mid April.

On rings, this window overlaps with spring wedding season, so capacity is tighter than the calendar suggests.

EventPO windowLand byRisk if late
Valentine'sEarly OctoberMid JanuaryRush freight
Mother's DayFebruaryMid AprilCapacity queue
GraduationFebruaryEarly MaySplit shipment
Holiday Q4June to JulyLate SeptemberAir freight premium

Read the table as a checklist rather than a recommendation. The right row depends on the price band, the wear pattern and the channel you sell into.

Put the forecast window in writing. Capacity priority follows predictability, not friendship.

03

HOLYCOME Editorial

reply #3

Window three: Q4 and holiday

Holiday selling starts in late October with early promotions and peaks in December. The carton should land by the last week of September, which means a June or early July PO.

This is the window where air freight becomes normal rather than exceptional. Budget for it in the landed cost from the start.

04

HOLYCOME Editorial

reply #4

Window four: the slow season build

July and August are the cheapest months for capacity and freight. Use them to build the basics: the top ten designs in the core sizes, at program tier.

That stock covers the Q4 surge and lets you skip rush premiums on rings when everyone else is bidding for bench time.

Price moves with three inputs: alloy, stone and plating. A quote that holds for ninety days is a quote that has priced those three honestly.

05

HOLYCOME Editorial

reply #5

What to check before the order

Run the five checks below in order. The first two protect the money, the last three protect the launch date.

  • Work backward from the shelf date, not the PO date.
  • Book Q4 capacity in June.
  • Build basics in July and August.
  • Budget air freight into the Q4 landed cost.
  • Keep a 20 percent buffer on the first seasonal lot.

If a supplier cannot answer three of the five, treat the quote as a starting point rather than a plan. Ask again in writing and keep the answer with the PO.

06

HOLYCOME Editorial

reply #6

Frequently Asked Questions

When should I place a rings order for Q4?

June to early July for a late September landing. Later than that and you are buying air freight.

Is the slow season really cheaper?

Yes, on both bench time and freight. July and August are the best months for basics.

How much buffer for a seasonal lot?

Twenty percent on the first run, ten on repeats, plus a split shipment plan for the top sellers.

Should I pre-build or chase demand?

Pre-build the top ten designs in core sizes. Chase the long tail with small repeat orders.

What if the season slips?

Move the stock to the next occasion and discount the tail. Do not pay a rush premium to rescue a missed window.

What belongs in the first email to a new supplier?

Spec, quantity, target price, delivery date and the QC standard. Five lines get a useful reply.

Send the rings seasonal plan and target shelf dates. We return a backward-scheduled PO calendar with capacity booked per window. See the full range at HOLYCOME.

None of this is exotic. It is a document, a measurement and a date, repeated until it becomes a process.

Join the thread. Ask a sizing, setting or sourcing question and the bench answers.

Post a question

Written By

HOLYCOME Editorial
Gemologists and setters at our own workshop. We have been cutting moissanite and lab grown stones since 2013.

Keep Reading

Related Articles

Newsletter

New arrivals & buying guides, once a month

Join 12,000+ customers for new designs, care tips and subscriber-only pricing.