Free worldwide shipping over $150GRA & IGI certified stones30-day returns & one free resize
Forum›Moissanite›Moissanite: Vetting a Factory: Seven Checks
HO

HOLYCOME EditorialOP

November 16, 2026 · 4 min read

Moissanite: Vetting a Factory: Seven Checks

Moissanite: Vetting a Factory: Seven Checks

A moissanite supplier can look convincing on a video call and still be a trading office with a rented showroom. Seven checks separate a factory from a broker, and all seven can be done before you wire the deposit.

6 replies in this thread

01

HOLYCOME Editorial

reply #1

Checks one to three: floor, alloy and bench

First, see the workshop floor live, not a slideshow. Second, confirm where the alloy comes from and whether the mill certificate exists. Third, count the benches and ask how many setters work on moissanite.

A factory with twenty benches and four setters is a real line. A factory with a showroom and no bench photo is a sales office.

Photograph the first article before the batch runs. A shifted seat or a short prong is cheapest to fix at one piece.

02

HOLYCOME Editorial

reply #2

Checks four to six: QC, sample time and terms

Fourth, ask to see the QC bench and the AQL sheet used on every lot. Fifth, time the sample: 3 to 5 days on a stock design. Sixth, read the payment terms: 30 percent deposit and 70 percent against documents is normal, 100 percent upfront is not.

These three checks tell you whether the factory runs a process or just a price list.

CheckPassWalk away
Workshop floorLive video on callShowroom only
Alloy sourceNamed mill, certificateGeneric claim
Bench and settersCounted, visibleNot shown
QC and AQLSheet shownNo QC step
Sample time3-5 days3 weeks or more
Payment terms30/70 against documents100% upfront
ReferencesTwo recent buyersNone

Read the table as a checklist rather than a recommendation. The right row depends on the price band, the wear pattern and the channel you sell into.

Seal the approved sample in a bag with the PO number. It is the only physical record that settles a claim without an argument.

03

HOLYCOME Editorial

reply #3

Check seven: two reference buyers

Ask for two buyers who ordered moissanite in the last twelve months, then call both. Ask about loose stones, plating wear and late shipments, not about how nice the salesperson is.

A factory that cannot name two references is either new or unwilling to be checked. Both are answers.

04

HOLYCOME Editorial

reply #4

What to do with a mixed result

Six of seven is worth a sample order. Four of seven means sample two more factories before choosing. Three or fewer means the low price is buying you a rework bill.

Write the seven checks into the moissanite supplier file and repeat them annually. Factories change ownership, staff and alloy sources.

Capacity is the constraint that price cannot solve. In peak season a cheaper factory with no slot is more expensive than a dearer one with a date.

05

HOLYCOME Editorial

reply #5

What to check before the order

Run the five checks below in order. The first two protect the money, the last three protect the launch date.

  • Do all seven before the deposit, not after.
  • Ask for the mill certificate, not a verbal claim.
  • Time the sample with a stopwatch.
  • Call both references yourself.
  • Re-run the checks every year.

If a supplier cannot answer three of the five, treat the quote as a starting point rather than a plan. Ask again in writing and keep the answer with the PO.

06

HOLYCOME Editorial

reply #6

Frequently Asked Questions

Do I need to visit China to vet a moissanite factory?

No. A live floor call, the QC sheet and two reference calls cover the essentials. A visit adds factory culture and bench observation.

What if the factory refuses a video call?

That is a fail on check one. Move to the next supplier; there are enough factories that will show the floor.

Is a trading company always worse?

Not always. A good trading company adds consolidation and export experience. The risk is that it cannot control the bench, so ask who owns the QC.

How do I check the alloy claim?

Ask for the mill certificate and a stamp photo, then test one piece at a local assay office. The test costs less than a wrong lot.

Should I ask for a factory audit report?

If one exists, read the corrective actions, not the score. A report with no open findings is usually a sales document.

How do I know a supplier is reliable?

Two clean repeat lots and two on-time shipments. Before that it is a sample, not a supplier.

Send the moissanite spec and volume. We return the seven-check sheet with the workshop video, the QC standard and two reference contacts. See the full range at HOLYCOME.

None of this is exotic. It is a document, a measurement and a date, repeated until it becomes a process.

Join the thread. Ask a sizing, setting or sourcing question and the bench answers.

Post a question

Written By

HOLYCOME Editorial
Gemologists and setters at our own workshop. We have been cutting moissanite and lab grown stones since 2013.

Keep Reading

Related Articles

Newsletter

New arrivals & buying guides, once a month

Join 12,000+ customers for new designs, care tips and subscriber-only pricing.