Holycome Trade DeskOP
November 20, 2026 · 3 min read
Earrings Custom OEM Private Label: production lead time calendar

7 replies in this thread
Understanding Our Production Timeline
When you place a custom OEM order for earrings, the first thing you’ll see is our 12‑ to 18‑day production window. This range is built around a three‑stage quality control process: incoming stone inspection, in‑process checking, and a final pre‑ship AQL audit. Each stage guarantees that the finished product meets the standard you expect.
Because we own the setting and polishing lines, we can keep lead times tight. Our average first‑pass yield is about 20 % higher than typical trading companies, which means fewer delays and more finished pieces ready for shipment.
Planning Your Order Size and Minimums
Our MOQ varies with the order type. For standard stock earrings, you can order as little as one piece. However, for truly custom designs, we require a minimum of 30 pieces. This helps us balance tooling costs with your unique design requirements.
If you need a single sample before committing, we can ship it separately at a lower cost. PayPal is accepted for sample payments, while T/T requires a 30 % deposit before production begins.
Key Dates in the Production Calendar
After the initial design approval, we lock in a production schedule. The first 6‑ to 8‑day phase covers stone sourcing, setting, and polishing. The next 4‑ to 6‑day phase is dedicated to detailed quality checks and final assembly. The remainder is buffer time to accommodate any last‑minute adjustments.
| Stage | Days | Key Activity | Notes |
|---|---|---|---|
| Stage 1 | 6‑8 | Stone & setting | Initial QC check |
| Stage 2 | 4‑6 | Polishing & assembly | In‑process QC |
| Stage 3 | 2‑3 | Final audit & packaging | Pre‑ship AQL |
Quality Certification and Transparency
Every batch of earrings can be accompanied by GRA or IGI certificates, giving you and your customers confidence in the authenticity of the stones. The certificates are issued after the final QC audit and before the goods leave our factory.
We record every step of the process, from stone origin to final polish. This traceability is a key selling point for private label buyers who want to present a full story behind their products.
Shipping Options and Delivery Times
- DDP delivery to the US averages 5‑8 days after the goods are ready for shipment.
- Within the EU, delivery typically takes 7‑10 days, depending on customs clearance.
- We accept T/T with a 30 % deposit and the remaining balance before shipping.
- For urgent samples, PayPal or a small bank transfer is acceptable.
- All shipments include a tracking number and insurance based on the declared value.
How We Keep Costs Competitive
Our vertical integration means we control every step of production, eliminating the markup that comes from passing goods through multiple middlemen. That translates into lower prices without compromising quality.
Because we maintain a lean operation, our lead times stay short and our spare part inventory is always stocked for quick repairs or replacements if needed.
Frequently Asked Questions
What is the minimum order quantity for custom earrings?
Custom orders start at 30 pieces to cover tooling and design costs, while stock pieces can be ordered as low as one.
How long does the entire production process take?
From design approval to final shipment, you’ll see a 12‑ to 18‑day window. Most orders finish in 15 days.
Do you provide certificates for your stones?
Yes, each batch can be accompanied by GRA or IGI certificates, confirming authenticity before shipping.
Ready to discuss your custom earring line? Contact us for a quote or request samples today.
Join the thread. Ask a sizing, setting or sourcing question and the bench answers.
Post a questionWritten By
Holycome Trade Desk
Gemologists and setters at our own workshop. We have been cutting moissanite and lab grown stones since 2013.



